Beneficiary: National Railway Company “CFR” S.A., Regional Office Bucharest
Duration: June 2016 – December 2016

Project Description

  • Repair and maintenance works of IVth Paneuropean Corridor – two contracts:
    • Section Bucuresti-Campina – Lot 2 Brazi-Campina
    • Section Bucuresti-Lehliu – Lot 2 Baneasa
  • Repair works of railways to eliminate the speed restriction – three contracts:
    • Lot 1 Line 100 Bucuresti Nord Videle between the stations Gradinari Vadu Lat Rail track I, Line 301Eb Jilava Chiajna; R1-R2 Jilava; Jilava Varteju
    • Lot 2 Line 301Ba Buciumeni – Mogosoaia, Post Buciumeni
    • Lot 3 Line 801B Bucuresti Obor – Pantelimon
  • Welding of rails and building of continuous welded rail track (CWR) – one contract:
    • Electric welding of rails and building of continuous welded rails
  • Maintenance and repais works of railways – three contracts:
    • Lot 1 Line 100 intre Station Videle R1 Videle; Station Vadu Lat
    • Lot 3 Line 500 Statia Valea Calugareasca (indirect lines and station lines) Rail track I and II
    • Lot 4 Station Chiajna
  • Design and execution of culvert – one contract:
    • Railway Bridge repairing, Rail track I Line Bucuresti – Pitesti km 90+247

Main Works:

  • Tamping I – 205 pcs.;
  • Construction of new culvert – 1 pcs.;
  • Replacement of Type 49 turnouts with Type 65 turnouts – 1 pcs. ;
  • Replacement of inner and outer concrete slabs – 381 pcs.;
  • Replacement of frogs and stock rail/guard rail assemblies – 38 pcs.;
  • Replacement of glued insulated rail joints – 54 pcs.;
  • Replacement of small track material and rubber plates – 58.214 pcs.;
  • Replacement of compontents of turnouts – 86 pcs.;
  • Rail replacement – 6.320 ml;
  • Replacement of concrete sleepers – 2.390 pcs.;
  • Replacement of special sleepers – 82.09 m3;
  • Replacement of wooden sleepers – 1.066 pcs.;
  • Ballast bed profiling – 100 m;
  • Thermite welding – CWR repair – 320 pcs.;
  • CWR refastening with complete stress relief – 7.790 m;